Used Self Erect Cranes West Virginia - The base of the tower crane is typically bolted to a huge concrete pad that provides very crucial support. The base is attached to a mast or a tower and stabilizes the crane which is connected to the inside of the building's structure. Usually, this attachment point is to a concrete lift or to an elevator shaft.
Usually, the mast is a triangulated lattice structure measuring 0.9m2 or 10 feet square. The slewing unit is connected to the very top of the mast. The slewing unit consists of a gear and a motor which enable the crane to rotate.
Tower cranes may have a max unsupported height of eighty meters or two hundred sixty five feet, while the tower crane's maximum lifting capacity is sixteen thousand six hundred forty two kilograms or 39,690 pounds with counter weights of twenty tons. Additionally, two limit switches are used in order to make sure that the operator does not overload the crane. There is even one more safety feature called a load moment switch to make sure that the operator does not surpass the ton meter load rating. Last of all, the maximum reach of a tower crane is 230 feet or 70 meters.
Due to their extreme heights, there is a science involved to erecting a crane. The stationary structure would at first have to be brought to the construction site by using a large tractor-trailer rig setup. Next, a mobile crane is utilized in order to assemble the machinery part of the crane and the jib. These parts are then attached to the mast. Afterward, the mobile crane adds counterweights. Crawler cranes and forklifts can be a few of the other industrial equipment which is utilized to erect a crane.
As the building is erected, mast extensions are added to the crane. This is how the crane's height could match the building's height. The crane crew utilizes what is called a top climber or a climbing frame that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. Once complete, the slewing unit could detach from the top of the mast. In the top climber, hydraulic rams are used to adjust the slewing unit up an additional 6.1m or twenty feet. Then, the operator of the crane uses the crane to insert and bolt into place another mast section piece.